Our projects / Mai Khao, Phuket
Five-Villa Lagoon Pool
A shared lagoon pool at the heart of five villas.
Completed- Location
- Mai Khao, Phuket, Thailand
- Completed
- 2025
- Type
- Renovation
- Our role
- Deep renovation after a flooded pump room: new pump room and system, rebuilt jacuzzi, new lighting, the finish and the terrace
- Finish
- PebbleCrete Classic Cool Blue · Sandy Beach on the terrace
- Applied by
- Pebble Pools
The work behind the setting.
Pebble Pools renovated the pool serving a group of five private villas after its underground pump room had flooded and everything inside it was lost. The pump room was rebuilt: sand filters replaced the old DE filters, every pump and valve is new, an emergency drain was added, and an air conditioner keeps the room dry. The sand filters are filled with PebblePure glass filter media.
The control panels had stood underground and had rotted; they now sit outside in weatherproof boxes. The drainage pumps are new and wired by water level, so everything switches off if the water rises. Six new salt chlorinators and new lighting were fitted across the pool, and the jacuzzi was rebuilt completely — blower, pumps and jets — with a control panel of its own, which it never had before.
The photographs follow the work from the drained pool through the strip-out and render to the Cool Blue finish. The pool edge was raised, and the terrace around the pool was extended and finished in Sandy Beach across its whole area as part of the same job.
Project photographs
Open any photograph for a closer look.
Related projects
CompletedMai Khao Dream Villa Resort
- Scope
- Mosaic fixing, grouting and lamination; copings and overflow on the rooftop pools; main pool coping; jacuzzi and shallow entrance; the main pool jacuzzi system brought back into service
- Material
- PebbleCrete Classic Black Granite on the copings and overflow · PebbleCrete Classic Polar White on the jacuzzi and shallow entrance · PebbleCrete Glass Carbon Black on the jacuzzis
- Applied by
- Pebble Pools
- Completed
- 2025
CompletedCrest Resort & Pool Villas
- Scope
- Strip-out and new finish on the villa pools, with steps and coping
- Material
- PebbleCrete Supreme Verde inside · PebbleCrete Glass Sea Mist Green on the coping
- Applied by
- Pebble Pools
- Completed
- 2025
CompletedWyndham Grand Phuket Kalim Bay — including The Deck pool
- Scope
- Resurfacing the in-pool loungers, benches, steps and edges at The Deck pool, the main pool and the room pools
- Material
- PebbleCrete Classic Pearl White
- Applied by
- Pebble Pools
- Completed
- 2025