Our projects / Ao Po, Phuket
The Estate, Ao Po
A tiled villa pool rebuilt and refinished in Sandy Beach Natural.
Completed- Location
- Ao Po, Phuket, Thailand
- Completed
- 2024
- Type
- Renovation
- Our role
- Strip-out, the jacuzzi replaced with steps, a simpler system with a new filter, salt chlorinator and lighting, render, coping and the new finish
- Finish
- PebbleCrete Classic Sandy Beach Natural
- Applied by
- Pebble Pools
The work behind the setting.
The pool came to us in dark blue tile with a mosaic flower on the floor. It still ran, but the filter leaked, the pumps were old, and the salt chlorinator, the blower, the jacuzzi and the lights no longer worked.
Pebble Pools took the tiling off, cut out the blower and the jacuzzi and built new steps in the jacuzzi’s place, removed the old pipework and the extra water inlets, and fitted a new sand filter, a new salt chlorinator and all-new lighting. The shell was rendered through and the sandstone coping set.
The finish is PebbleCrete Classic Sandy Beach Natural, carried across the pool, the steps and the overflow channel.
How this job ran
BeforeThe old tiled steps
DemolitionThe old tiling broken off
During worksAcid wash of the new finish
CompletedFilling the pool
Project photographs
Open any photograph for a closer look.
Related projects
CompletedPrivate Villa, Rawai — Polar White
Leak found and fixed at the overflow; tile and render stripped, new steps, drain channel, top-up, salt chlorinator and pump, new finish
The renewed pool and the villa
CompletedAspasia Kata
Replacement of the blue tile with a PebbleCrete finish
The pool terrace above Kata Bay
CompletedPrivate Villa — New Pool Steps
Rebuilding and refinishing the pool steps
The pool refilled over the new steps
Tell us where the pool is and what you want changed.
Send photos → discuss the work → site assessment if needed → quotation
Call 089 277 3314Email photos of your poolAdd us on LINEDiscuss your project